G98 or G99? Scotland Solar Export Calculator

Determine DNO notification requirements for Scotland

Critical for Installers

Every solar PV system in Scotland must be registered with the local Distribution Network Operator (DNO) before energising. The notification process depends on total generation capacity at the connection point:

G98 Self-Notification

  • • Single-phase: ≤3.68kW
  • • Three-phase: ≤11.04kW
  • • Typical approval: 28 days
  • • No assessment fees

G99 Formal Application

  • • Single-phase: >3.68kW
  • • Three-phase: >11.04kW
  • • SPEN: ~65 days, SSEN: ~45-55 days
  • • Possible fees: £0-£500

System Details

NOTIFICATION REQUIRED: G99

Total generation at connection:4.00kW
G98/G99 threshold (single phase):3.68kW
Typical approval time:65 days

⚠ G99 Formal Application Required

Your system exceeds the G98 threshold and requires formal G99 DNO approval. This typically takes 65 working days and may incur assessment costs of £0-£500 depending on network constraints.

Scotland DNO Contacts

DNOCoverageG98 ThresholdContact
SP Energy NetworksCentral/SW Scotland3.68kW (1φ)
11.04kW (3φ)
Scottish & Southern Electricity Networks (North)Highlands & Islands3.68kW (1φ)
11.04kW (3φ)
Scottish & Southern Electricity Networks (South)SE Scotland3.68kW (1φ)
11.04kW (3φ)

What If I'm On The Border?

If your proposed system is close to the G98/G99 threshold (e.g., 3.5-4kW), consider:

  • Designing the system at or below 3.68kW to qualify for G98
  • Installing an export limiter to cap export at 3.68kW while allowing higher self-use
  • Three-phase connection raises threshold to 11.04kW

Export Constraints in Scotland

Some rural areas — particularly SSEN North (Highlands & Islands) — have network constraints that may limit export regardless of G98/G99 approval.

This is critical for SEG income calculations. Scottish Energy Efficiency always checks export constraints before quoting.

View Scotland DNO Constraint Map →
📋

Need G98/G99 Submission Support?

Scottish Energy Efficiency handles all DNO notifications as part of our MCS installation service. We've submitted over 500 G98/G99 applications across Scotland.